When should asbestos be addressed before demolition or renovation?
For owners, developers, facility teams, and general contractors working in existing buildings
Asbestos and other regulated materials should be addressed during preconstruction—before demolition methods, permits, schedule, hauling, and disposal are finalized. Applicable inspection, notification, abatement, and disposal requirements depend on the building and project.
Why the review belongs up front
Late discovery can stop work, change demolition methods, affect worker protection, and disrupt disposal and schedule planning. Early review allows the environmental and demolition scopes to be sequenced as one preconstruction plan.
Information to gather
Useful starting information includes the property address, building use, age, renovation history, existing surveys or reports, proposed disturbance areas, planned demolition date, and the permitting authority.
A coordinated handoff